CLEARFIELD — A Derrick Road bridge spanning Foster Brook in Foster Township has reopened to traffic.
Thes bridge was replaced as part of the Pennsylvania Department of Transportation’s Rapid Bridge Replacement Project and allows PennDOT to remove it from the state’s structurally deficient bridge list.
With the bridge reopened, motorists may notice a slight bump as they drive across the bridge until a polyester polymer concrete (PPC) overlay is applied to the deck. This is often the final step in completing box beam bridge projects. The PPC overlay is designed to protect the deck from the wear and tear brought about by Pennsylvania’s harsh winters and reduce the long-term maintenance costs.