CLEARFIELD — A Route 155 bridge in Liberty Township reopened to traffic Tuesday.
The bridge spans Allegheny Portage Creek near the Potter County line and was replaced as part of the Pennsylvania Department of Transportation’s Rapid Bridge Replacement Project. Replacement allows PennDOT to remove it from the state’s structurally deficient bridge list.
With the bridge reopened, motorists may notice a slight bump as they drive across the bridge until a polyester polymer concrete overlay is applied to the deck. This is often the final step in completing box beam bridge projects. The PPC overlay is designed to protect the deck from the wear and tear brought about by Pennsylvania’s harsh winters and reduce the long-term maintenance costs.
The polyester material can only be applied when temperatures are consistently above 40 degrees, dry weather is forecasted and after the bridge concrete has cured for at least 30 days. An alternating traffic pattern will be controlled by flaggers when the PPC overlay is applied in late August.